QMC - Building Intelligence with Submetering Solutions

Integrated Submetering

Why You Should Sub-meter in Alberta and BC: 3 Facts

It’s no secret that the world is changing rapidly: From 100 year storms occurring every 30 years now to an increase in drought risk in more areas, climate change can be felt in all parts of the world. This increases the price of overall utilities. A big issue in Canada, specifically British Columbia (BC) and […]

Electric Vehicle charging stations; subject to federal measurement statutes?

A recent bulletin from Measurement Canada provides helpful information for property managers, electrical contractors and engineers designing and installing EV charging systems on their properties.  This bulletin explains the difference between an EV charging station providing a prepaid service on the basis of time vs. an EV charging station supplying electricity sold by energy or […]

Submetered Green homes result in water, energy & cost savings

The project: Clarington Green Demonstration Project. Six demonstration homes, incorporating practices that aim to reduce their environmental impact for water and energy  were constructed exceeding Ontario’s 2012 Building Code. These so-called ‘better than code homes’ were monitored for performance and potential savings over the course of a year.  Client: Municipality of Clarington,with the Region of Durham QMC’s Project scope:  […]